Total bathroom re-fub

Total bathroom re-fub

This bathroom was total gutted and re-built in November 2008.

The joists were rotten and so was the floor.  This was replaced and a new suite installed.  We also tiled the entire bathroom.

This bathroom was total gutted and re-built in November 2008.

The joists were rotten and so was the floor. This was replaced and a new suite installed. We also tiled the entire bathroom
This was total gutted and re-built in November 2008.

The joists were rotten and so was the floor. This was replaced and a new suite installed. We also tiled the entire
Hi everyone how are you blah blah blah hope you find my site informative please read more and use our services. build build build
Curved retCurved retaining wall built in Romsey. This was structurallly designed to hold the load behind. For extra wow factor curves were added.aining wall built in Romsey. This was structurallly designed to hold the load behind. For extra wow factor curves were added.Curved retaining wall built in Romsey. This was structurallly designed to hold the load behind. For extra wow factor curves were added.